• Connect the heat trace cable to the junction box. • Slide the jacket up the side of the tank and pull the drawstring at the top of the jacket. • Place the junction box in the pocket on the inside of the jacket. Figure 1 Back View Bradley Corporation • 215-084 Rev. L; EN 02-586 10-Gallon Tank with Eye Wash and Optional Heater Jacket S19-690LHS, S19-690H Installation Instructions Installation Instructions continued . . . Step 2: Fill tank and pressurize 1. If the tank is pressurized, relieve the
. . . . . . . . . . . . . .2 Installation Instructions . . . . . . . . . . . . . . . . .3–4 Maintenance Instructions . . . . . . . . . . . . . . . . .5 Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . .5 Assembly of Components . . . . . . . . . . . . . . . .6 Parts List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6 IMPORTANT This equipment should be inspected, tested, and recorded weekly to maintain proper operation. Read this installation manual thoroughly before beg
File these instructions with the owner or maintenance department. P.O. Box 309, Menomonee Falls, WI 53052-0309 215-1384Rev.A;EN01-819 TEL. 1-800-BRADLEY FAX (262) 251-5817 Page1of4 Express® LavatorySystemMG-SeriesExtension MG-EXT InstallationInstructions Pre-Installation Information Check Contents Separate all parts from the packaging and check each part with the drawing below. Make sure all parts are accounted for before discarding any packaging material. If any parts are missing, do not attemp
3 Assembly of Components ................. 4 PartsLis ............................ . 4 IMPORTANT This equipment should be inspected, tested, and recorded weekly to maintainproper operation. Main water supply to the eye wash should be “ON” at all times. This installation manual and parts list should be filed by the building owner’s maintenance department. 215-148AE Ref. G; EN 98-579 Page 1 of 4 PO. Box 309, Menomonee Falls, WI USA 53052-0309 PHONE (414) 251-6000 FAX (414) 251-5617 http:/lBradley
Simply omit the steps which do not apply to the unit you are installing. Valve Left/Seat Right version is shown throughout this manual. Valve Right/Seat Left is opposite. Plumbing contractor shall be responsible for installing shower face plate at the correct height to meet accessibility requirements. This installation manual and parts list should be filed by the owner’s maintenance department. Installation Instructions ADA Compliant HN200 Recess-Mounted Shower with • Equa Flo™ • Accu-Zone™ Infr
FRAME (4) 3/8" BOLT AND WASHER Figure 4 Figure 2 1-1/2" NPT DRAIN STUB-OUT 1/2" NPT HOT AND COLD SUPPLIES OR TEMPERED SUPPLY STUB-OUTS Figure 3 PANEL FRAME (8) TORX-HEAD SCREW SCUFF PANEL (do not remove) SCUFF PANEL (do not remove) Installation Instructions continue . . . Bradley Corporation • 215-1244 Rev. D; EN 08-805 4/24/08 Express® Lavatory System SS-Series SS-2/AST/STD, SS-2/AST/JUV Installation - Obsolete Installation Instructions continued . . . Step 3: Installing bowl assembly IMPORTANT
IMPORTANT Read this entire installation manual to ensure proper installation, thenfile these instructions with the owner or maintenance department. Flush all the water supply linesbefore making connections. Wall anchors used must have a minimum pull-out rating of 1,000lbs. Product warranties may be foundunder "Product Information" on our web site at Table of Contents Pre-Installation Information . . . . . . . . . . . . . . . .2 Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . .3-4
When mounted at 34" rim height, the Express® meets ADA, ANSI and UFAS requirements for barrier-free clearances, reaches and controls. Always check local codes and ordinances for compliance. Barrier-free and ADA compliant - juvenile height mounting The SS-2/IR/JUV Express® Lavatory System is compliant with Americans with Disabilities Act (ADA) Accessibility Guidelines for Buildings and Facilities: Building Elements Designed for Children's Use; Final Rule. Infrared sensor and solenoid Each sprayhe
. . Bradley Corporation • 215-1243 Rev. E; EN 08-805 4/24/08 Express® Lavatory System SS-Series SS-2/IR/STD, SS-2/IR/JUV Installation - Obsolete Installation Instructions continued . . . Step 2: Mounting frame to wall 1. Remove the eight Torx-head screws securing the panel to the frame, and remove the panel (see Figure 3). Note: Scuff panel does not need to be removed. 2. Position the frame against the wall, ensuring that it is level. If necessary, insert shims under the frame until level. Note:
Do not use pipe dope on faucet and supply connections. Possible solenoid contamination could occur and will void any warranty. Teflon tape is the recommended sealant. Use plumber’s putty only to seal the faucet to the deck. The installation site should have access to an electrical box with 120 volt AC, 60 Hz cycle for input to a transformer. When installing the transformer, the electrical box should be located within six feet of the sink. The DC faucets are powered by four “AA” factory-installed