Login:
Votes - 4, Average rating: 4 ( )

User manual Kobe Range Hoods, model CH7942SQB

Manafacture: Kobe Range Hoods
File size: 2.56 mb
File name:
Language of manual:enesfr
Free link for this manual available at the bottom of the page



Other manuals for this model:
Fans - CH7942SQB (5.72 mb)enesfr

manual abstract


- Try to avoid as many transitions, elbows, and long run as possible. This may reduce the performance of the hood. - Temporarily wire the hood to test for proper operation before installing. - Peel protective film off the hood (if any). - For installing under the cabinet with recessed bottom, attach 4-inch wide wood filler strips (not included) on each side. Refer to Figure 7. - Measure and create access opening for electrical wires under the cabinet or access opening for the electrical wires at the rear of the hood. - Remove the screws on the vent cover (rear) and cut along the line of the inner vent cover (rear) opening. Refer to Figure 8. - Cut the vent cover (rear) opening and reverse to the other side. Refer to Figure 9. Reattach the vent cover (rear). Figure 6 Figure 7 Inner Vent Reversed Cover (Rear) Vent Cover (Rear) Figure 8 Figure 9 9 Hood Installation CAUTION: If required to move the cooking range to install the hood, turn off the power on an electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE. 1. Puncture the knockout holes on the hood as shown in Figure 10. 2. Unscrew and remove the multi duct exhaust. Replace with {D} vent cover (top). Refer to Figure 11. Figure 10 Figure 11 3. If necessary, arrange the electrical wires to run through the 1” diameter hole on the top or the rear of the hood. Refer to Figure 12. 4. Using references on Table 1 and measurements on Page 22 to center the hood in place beneath the cabinet and flush with the front of the cabinet. 5. Place screw (not provided) into the exact center of each knockout hole. Make sure all screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS SECURE BEFORE RELEASING. 1” Diameter Hole Figure 12 Ductwork Installation 6. Use aluminum or steel pipe to connect the exhaust opening at the rear of the hood to the ductwork. Use duct tape to make all joints secure and air tight. 10 WALL MOUNT INSTALLATION – TOP VENT ***This installation only applied with the purchase of a duct cover. Preparation before Installation NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING. - Decide the location of the venting pipe from the hood to the outside. Refer to Figure 13. - A straight, short venting run will allow the hood to perform more efficiently. - Try to avoid as many transitions, elbows, and long run as possible. This may reduce the performance of the hood. - Use duct tape to seal the joints between pipe sections. - If necessary, prepare back wall frame with cross framing lumber for secure installation. - Using references on Table 2 and measurements on Page 22-23, decide the level of the lumber. Refer to Figure 14. Hood Preparation before Installation - Temporarily wire the hood to test for proper operation before installing. - Peel protective film off the hood and the duct cover (if any). - Cut the multi vent exhaust according to the size of the venting pipe. Refer to Figure 15. Figure 13 Figure 14 6" Round Vent 7" Round Vent 3-1/4" x 10" Vent Figure 15 11 - If necessary, attach two rubber stands (provided) with two (4x8 mm) screws (provided) to the back of the hood. - Attach the hood-mounting bracket to the back of the hood with nine (3/16" x 3/8") screws (provided) as shown in Figure 16. Hood Installation CAUTION: If required to move the cooking range to install the hood, turn off the power on an electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS RANGE. 1. Using references on Table 2 and measurements on Page 22-23, mark the leveling point of the hood. Position two mounting screws (not provided) on the wall, leaving 1/8” away from the wall as shown in Figure 17. Mounting Screws Figure 16 Figure 17 2. Align hood-mounting bracket to the two screws on the wall and hook hood into place. Tighten screws to secure hood to the wall. CAUTION: MAKE SURE THE HOOD IS SECURE BEFORE RELEASING. 12 Duct Cover Installation 3. Mark the position of the duct cover-mounting bracket. Use reference E from Table 2 and measurements on Page 22-23. Attach and secure duct cover-mounting bracket with two screws (not provided). Refer to Figure 18. NOTE: Inner duct cover will cover the duct cover-mounting bracket. 4. Use aluminum or steel pipe to connect the plastic exhaust on the hood to the ductwork above. Use duct tape to make all joints secure and air tight. 5. Connect electrical wires. Refer to “Wiring to Power Supply” on Page 17. 6. Slide the inner duct cover up 2 inches before sliding the entire duct cover onto the hood. Refer to Figure 19. Figure 18 Figure 19 7. Adjust the height of the inner duct cover to the duct cover-mounting bracket. Secure the inner duct cover with two (4x8 mm) screws (provided) as shown in Figure 20. Figure 20 Attach Together 8. Fasten outer duct cover to multi vent exhaust on the hood with four (4x8 mm) screws (provided). 13 WALL MOUNT INSTALLATION – REAR VENT ***This installation only applied with the purchase of a duct cover. Preparation ...

Other models in this manual:
Fitness Equipment - CH7930SQB (2.56 mb)
Fitness Equipment - CH7936SQB (2.56 mb)
Fitness Equipment - CH7948SQB (2.56 mb)

Reviews



Your review
Your name:
Please, enter two numbers from picture:
capcha





Category