|
manual abstract
Fig. 6b. 6. Remove the COUPLING NUT (14) from BRASS ELBOW (12) and slide it onto the HORIZONTAL TUBE (11). Install the SQUARE SEAL WASHER (13) onto the PLASTIC SUPPORT (15) if not already installed. Insert the PLASTIC SUPPORT (15) into the HORIZONTAL TUBE (11). Connect the COUPLING NUT (14) to the BRASS ELBOW (12) and tighten fully. Fig. 6b. 7. From behind the wall install the ELBOW AND TUBE ASSEMBLY (12, 11) through the hole in the wall. Install WALL ESCUTCHEON (16) onto HORIZONTAL TUBE (11). Assemble the COUPLING NUT (6a) and TAPERED RUBBER WASHER (7) in the CHROME ELBOW (5) onto the HORIZONTAL TUBE (11). Push the HORIZONTAL TUBE (11) into the CHROME ELBOW (5). Tighten COUPLING NUT (6a) but not fully. Fig. 6b. 8. For back spud installations: Follow steps #1 and #2 to install the spud coupling kit. Push the HORIZONTAL TUBE (11) into the spud connection on the back of the fixture. Do not tighten fully. If spud coupling kit is not required install HORIZONTAL TUBE (11) into back spud on fixture and hand tighten. Fig. 6b. 9. All installations: If required cut scored VACUUM BREAKER PIPE (17) to fit, leave a minimum of 1-1/4" (32mm) of pipe to ensure engagement with compression coupling. Assemble the COUPLING NUT (18) and TAPERED RUBBER WASHER (19) in the BRASS ELBOW (12) onto the VACUUM BREAKER PIPE (17). Install VACUUM BREAKER PIPE (17) into BRASS ELBOW (12) and hand tighten COUPLING NUT (18). Fig. 6c. Note: If cutting VACUUM BREAKER PIPE (16) to size, note that Critical Line (C/L) on Vacuum Breaker must typically be 6" (152mm) above fixture. Consult Code for details. Fig. 6 Fig. 6a Fig. 6b Fig. 6c 1 2 3 4 1-1/2" TOP SPUD 9 14 1612 11 15 5 7 6a 13 6a 8 7 5 610 FLANGE END UP FLANGE END 11 18 19 19 17 TOP SPUD INSTALLATION BACK SPUD INSTALLATION BACK SPUD INSTALLATION TOP SPUD INSTALLATION 2 M968550 REV. 1.6 TAPERED SIDE TAPERED SIDE 12 TAPERED SIDE UP TAPERED SIDE UP 4 5 INSTALL FLUSH VALVE; Fig. 8 1. Insert the side ADJUSTABLE TAILPIECE (1) on the FLUSH VALVE (2) into the SUPPLY STOP (3). Lubricate the TAILPIECE O-RING (4) with water if necessary. Lightly tighten COUPLING NUT (5). Fig. 8. Important: Do not use lubricants (other than water) or any type of thread sealing paste or tape. 6 CONNECT FLUSH VALVE TO PIPING; Fig. 9 1. Align the FLUSH VALVE (2) (Fig. 9) directly above the VACUUM BREAKER TUBE (7) and VACUUM COUPLING NUT (6). Make sure that GASKET (10) is installed. Note: There is a +13mm, -6mm (+1/2, -1/4) tolerance for the 121mm (4-3/4) dimension. Fig. 9. 2. Pull the VACUUM BREAKER TUBE (7) up to meet the threaded FLUSH VALVE CONNECTION (8) and hand tighten the COUPLING NUT (6). Align all components of the flush valve assembly. Fig. 9. 3. Lightly tighten the TAILPIECE COUPLING NUT (5) connection first, then the VACUUM BREAKER COUPLING NUT (6) and finally the SPUD COUPLING NUT (9). Once alligned correctly, use a wrench to tighten all couplings to make water tight connections. Fig. 9. 4. Secure piping behind wall as req...
Other models in this manual:Plumbing Product - SELECTRONIC 6065.22X (869.21 kb)
Plumbing Product - SELECTRONIC 6065.26X (869.21 kb)
Plumbing Product - SELECTRONIC 6068.22X (869.21 kb)
Plumbing Product - SELECTRONIC 6068.26X (869.21 kb)