Login:
Sorted: Name ↑   Downloads   Rate   Size ↑  
downloaded: 4   File size: 5 mb   Manafacture: Empire Comfort Systems  
Category: Fireplaces
@name

Different hole locations can be used for finishing materials with thicknesses of 3/8", 1/2" and 3/4". Attach these materials with screws provided, two (2) per framing bracket. See Figure 8. Framing brackets should fit directly against framing material. Use at least one (1) nail per bracket to secure in place. Check squareness of the firebox prior to securing to framed opening. See Figure 9. Figure 8 A black hood that is furnished with each firebox (or optional hood) MUST be installed before the

downloaded: 6   File size: 5 mb   Manafacture: Empire Comfort Systems  
Category: Fireplaces
@name

See Figures 13 and 14. 2. Move the left hand curtain screen to the center of the firebox opening. 3. Grasp the long control rod lever with control bracket (items 7 and 8 in Fresh Air Kit Parts List) securely with a vise grips as shown in Figure 15. Figure 13 Figure 15 Figure 16 Figure 17 TO INSTALL BVA-1 FRESH AIR KIT, REMOVE RECTANGULAR CUT-OUT WITH SHEET METAL CUTTERS Figure 14 Page 10 23200-0-1206 with the hole in the front flange of the movable air door. See Figure 18. 7. Once the control ro

downloaded: 4   File size: 5 mb   Manafacture: Empire Comfort Systems  
Category: Fireplaces
@name

Carefully position the rod and bracket so that the bracket can be secured to the inside opening of the firebox with two screws. See Figure 16. Do not remove vise grips at this time. 5. Working from the side cutout opening, place the slightly opened air door assembly into the cutout opening as shown in Figure 17. 6. While holding the door assembly in your left hand, grasp the vise grip (attached to the long control rod). Rotate and move the control rod around until the inside end of the rod is ma

downloaded: 6   File size: 5 mb   Manafacture: Empire Comfort Systems  
Category: Fireplaces
@name

State of Massachusetts: The installation must be made by a licensed plumber or gas fitter in the Commonwealth of Massachusetts. The state of Massachusetts requires that a flexible appliance connector cannot exceed three feet in length. Sellers of unvented propane or natural gas-fired supplemental room heaters shall provide to each purchaser a copy of 527 CMR 30 upon sale of the unit. In the State of Massachusetts, unvented propane and natural gas-fired space heaters shall be prohibited in bedroo

downloaded: 8   File size: 5 mb   Manafacture: Empire Comfort Systems  
Category: Fireplaces
@name

3. Run the other end of the duct through the exterior wall cutout. 4. From the outside of the building, connect the duct to the collar on the outside air vent assembly with band clamp or screws to secure. 5. Mate the outside rain cap hood over the air vent, seal with caulk as necessary, then secure with screws provided to the exterior wall surface. See Figure 22 and 23. 6. Figure 24 illustrates the various options for installation of the air duct run possibilities. OUTSIDE HOOD 4” DIA. AIR DUCT

downloaded: 4   File size: 5 mb   Manafacture: Empire Comfort Systems  
Category: Fireplaces
@name

Remove fan and clean blower wheels. Warning: Unplugging of blower accessory will not stop the heater from cycling. To turn off gas to the heater (millivolt model): push in gas control knob slightly and turn clockwise to “OFF.” Do not force. To turn off gas on direct ignition model, turn gas line valve to “OFF.” 1 FBB5 BLOWER ASSEMBLY COMPLETE 2 R8199 FAN CONTROL SWITCH 1 2 A B 110 VOLT AC JUNCTION BOX WHITE FAN SWITCH BLACK FAN/MOTOR ASSEMBLY Figure 31 Figure 32 JUNCTION BOX WIRING INSTALLATION

downloaded: 9   File size: 5 mb   Manafacture: Empire Comfort Systems  
Category: Fireplaces
@name

5. Once the blower assembly is in position, locate the plug button in the top right rear corner of the firebox. Remove the plug with a standard screwdriver and discard plug. 6. Next, find the fan control switch and wire assembly. Feed the wires through the hole at the top of the firebox, and secure the fan control switch with (2) #6 screws provided. See Figure 29. 7. The fan control wires will slide down between the firebox and outer wrap near the blower assembly. See Figure 29. 8. One fan contr

downloaded: 3   File size: 5 mb   Manafacture: Empire Comfort Systems  
Category: Fireplaces
@name

TANK CAN CAUSE EXPLOSION. Install only a ANSI Z21.11.2 vent-free log set into this firebox. Figure 11 Extended Hoods If your non-combustible facing material is over 1" in thickness that will be used to finish this firebox, an extended hood is available that will extend out 2" farther out into the room. Contact your local dealer for details. Finishing All joints (top, bottom and sides), where the wall or decorative facing material meets the firebox surround should be sealed with a noncombustible

downloaded: 5   File size: 5 mb   Manafacture: Empire Comfort Systems  
Category: Fireplaces
@name

Gas supply piping should also be planned at this time. A gas shut off must be in this line. 45° 6” 3” MAX. PERPENDICULAR SIDE WALL FRONT FACE (SIDE) FIREBOX (TOP VIEW) COMBUSTIBLE MATERIALS ALLOWED IN SHADED AREAS FIREBOX STAND OFF FINISH WITH TRIM KIT OR NON-COMBUSTIBLE MATERIAL AS DESIRED. COMBUSTIBLE FINISHED WALL 2 X 4 OR MANTEL HEADER MANTEL HOOD 13” 10” 12” MAX 42” MIN. (CEILING TO TOP OF HOOD) 11 1/2” MIN. FIREBOX FACE 84” MIN. (CEILING TO FLOOR) CEILING COMBUSTIBLES ALLOWED 3/8” COMBUSTI

downloaded: 0   File size: 4 mb   Manafacture: Empire Comfort Systems  
Category: Fireplaces
@name

Then take the same immediate action recommended above for the occasion when you do detect the odorized LP-Gas. • If you experience a complete “gas out,” (the container is under no vapor pressure), turn the tank valve off immediately. If the container valve is left on, the container may draw in some air through openings such as pilot light orifices. If this occurs, some new internal rusting could occur. If the valve is left open, then treat the container as a new tank. Always be sure your contain





Category