Login:
Votes - 2, Average rating: 3 ( )

User manual FireplaceXtrordinair, model VFP36SP32EP-2

Manafacture: FireplaceXtrordinair
File size: 5.89 mb
File name:
Language of manual:en
Free link for this manual available at the bottom of the page



manual abstract


Note: If only the blower option is to be installed, wiring may be performed as described and illustrated in the following Blower Installation section. Page 26 26670-0-0110 Attention: Install blower assembly before connecting gas inlet supply line. Wiring The appliance, when installed, must be electrically grounded in accordance with local codes or, in the absence of local codes, with the National Electrical Code, ANSI/NFPA 70, if an external electrical source is utilized. This appliance is equipped with a three-prong [grounding] plug for your protection against shock hazard and should be plugged directly into a properly grounded three-prong receptacle. Do not cut or remove the grounding prong from this plug. For an ungrounded receptacle, an adapter, which has two prongs and a wire for grounding, can be purchased, plugged into the ungrounded receptacle and its wire connected to the receptacle mounting screw. With this wire completing the ground, the appliance cord plug can be plugged into the adapter and be electrically grounded. Caution: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing. Note: Junction box is to be located in the lower compartment of the fireplace and must be pre-wired at time of fireplace installation for use with blower assembly. A standard ON/ OFF wall switch or SCV-1 variable speed control kit should be installed to activate power to the Junction Box and provide power for the operation of the blower assembly. It is recommended that installation of the wiring be performed by a qualified electrician. See Figures 20 and 21. 1. If installed, turn OFF gas supply to fireplace. 2. If applicable, turn OFF electric supply to fireplace. 3. Remove bottom louver from fireplace. CAUTION: ALL WIRING SHOULD BE DONE BY A QUALIFIED ELECTRICIAN AND SHALL BE IN COMPLIANCE WITH ALL LOCAL, CITY AND STATE BUILDING CODES. BEFORE MAKING THE ELECTRICAL CONNECTION, MAKE SURE THAT MAIN POWER SUPPLY IS DISCONNECTED. THE APPLIANCE, WHEN INSTALLED, MUST BE ELECTRICALLY GROUNDED IN ACCORDANCE WITH LOCAL CODES, WITH THE NATIONAL ELECTRICAL CODE ANSI/NFPA 70 (LATEST EDITION). To install the blower kit, access the junction box, or install a light kit, remove lower louver as illustrated by figure 21. A factory included junction box is located on the lower right side of the fireplace. Wiring must be fed through the 7/8" diameter hole provided on the lower side of the fireplace, and secured to the outer wrap with the clamp provided. Leave approximately 6” of wire in the junction box for connection. Attach black wire to one side of the receptacle and white wire to opposite side of receptacle. The ground wire should be attached to the green (ground) screw. See Figure 20. Install the receptacle into the junction box as illustrated. Attach cover plate. Place Junction Box so that it is approximately 8 to 12" away from the outer wrap wall. Secure wiring at outer wrap of fireplace with wire clamp provided. Attention: If installed, do not damage gas inlet supply line when blower assembly is inserted into fireplace. In some cases, removal of the gas inlet supply line may be necessary. Figure 20 Figure 21 OPTIONAL FBB5 BLOWER INSTALLATION INSTRUCTIONS 26670-0-0110 Page 27 4. Insert blower assembly into interior, bottom of firebox. Note: On peninsula models, the blower must be installed at the end which has the brick panel installed. Position blower assembly so that you align the notch on back of blower assembly with the center screw on side/end panel, then push the blower assembly against firebox outer panel. The blower wheel must be centered with the side/end wall of the firebox. The magnets on the back and bottom of blower assembly will sufficiently hold blower assembly in place. See Figure 23. 5. Once the blower assembly is in position, locate the plug button in the top corner of the firebox. Remove the plug with a standard screwdriver and discard plug. 6. Next, find the fan control switch and wire assembly. Feed the wires through the hole at the top of the firebox, and secure the fan control switch with two (2) #6 screws (provided). The fan control wires will slide down between the firebox and outer wrap near the blower assembly. See Figure 22. 7. Route the wires away from moving parts of the blower assembly and retain wires together near the blower motor using the plastic purse clip provided. 8. To complete the installation, plug the power cord into the junction box receptacle previously installed in the bottom of the fireplace. See Figure 23. 9. Once all connections are made electrically, it is recommended that you test the blower fan control operation by turning on power to the blower (Caution: 110 Volt). Turn the fireplace on and let run until blower is activated. This should take approximately 10 to 20 minutes from a cold start. Once blower is activated, check for proper operation. Do not place hands near blower a...

Other models in this manual:
Fireplaces - VFP36PP32EN-2 (5.89 mb)
Fireplaces - VFP36PP32EP-2 (5.89 mb)
Fireplaces - VFP36SP32EN-2 (5.89 mb)

Reviews



Your review
Your name:
Please, enter two numbers from picture:
capcha





Category