![@name](/images/flag/s/en.gif)
A backguard should be ordered at the same time as the range. Both must be on site at the time of installation. Order one backguard for 48" models: ZX1B48WSS-1-1/2" high backguard (required for island installations) ZX12B48WSS-12" high backguard ZX22B48WSS-22" high backguard with warming rack (2 piece) Advance Planning: Refer to dimensional drawings for appropriate placement and necessary clearances when planning the installation. • Cabinetry cannot be installed directly above the range. •