
Beer pump panels should not be installed with a height of greater than 5 feet from the cooler floor. A height greater than 5 feet will potentially cause flow issues and require system re-balancing. (Note: Make sure panel is level and pumps are in the vertical position). ¦ Drill 9/64” pilot holes in cooler wall. Use fasteners provided in installation kit to mount the beer pump panel to the cooler wall. ¦ Push CO2 supply line over barbed CO2 supply inlet. (See diagram on page 3). Position clamp ov