|
Other manuals for this model:
manual abstract
9) 10 b b b b 10 6. Order of Installation 3) Work Related with Integrated Door Panel. 912mm 14 13. Hang the top bracket .. of the integrated door panel on the height adjusting screw of the door top part after inserting the height adjusting nut ..(2 places) on to the height adjusting screw. Loosely tighten the height adjust nut .. (2 places) (See Figure 10). 16. Start work from step No. 13 again after releasing the height adjust nut .. where the dimension is not matched. 15. Check the dimension by using the spanner .. (See Figure 12). 14. Move the integrated door panel to the left or right and adjust the left/right interval uniformly after checking the integrated door panel and the door of the freezer are parallel (Move position of the height adjust nut .. for adjustment up or down when they are not parallel) (See Figure 11) Height Adjust Screw (Fig. 10) Forward/ Backward Top/Down Left/Right Adjust (Fig. 11) 4mm Parallel Parallel Spanner Integrated door 4mm Front Part of Cabinet (Fig. 12) d d d g g 10 Perform work with care since you may be injured or the integrated door panel of the freezer is damaged because the hole is unmatched when installing the integrated door panel of the freezer. 6. Order of Installation 4) Work Related with the Freezer Door 15 17. After positioning the depth adjust bracket .. as in Figure 13, fix it with the hinge adjust screw ..(2 places) and then fix it with the top bracket bolting screw .. (4 places) (See Figure 13). 18. After inserting the wood bolting screw .. (4 places) into the depth adjust bracket .., move the integrated door panel to the depth direction and adjust the interval to 4mm (see Figure 12). (See Figure 14). 19. Install the top bracket cover .. of the integrated door panel on the top side of the freezer door, and install the depth adjust bracket cover .. on the underside of the freezer(See Figure 15). depth interval (Fig. 13) (Fig. 14) c b e 4 3 6. Order of Installation 4) Work Related with the Freezer Door (Fig. 15) Underside of the Freezer door Topside of the Freezer door .. 11 16 20. After inserting the height adjust nut (2 places) into the height adjust screw, hang the top bracket .. of the integrated door panel on the height adjust screw on the top part of the refrigerator door.Loosely tighten the height adjust nut (2 places) (See Figure 16). 21. Move the integrated door panel to the left or right and adjust the left/right interval uniformly after checking the integrated door panel and the door of the fridge are parallel (See Figure 17). (Move position of the height adjust nut for adjustment up or down when they are not parallel) 23. Check the size by using the spanner (See Figure 18). Specially, check the interference between the fridge door and the freezer door(or freezer hinge). 22. Adjust depth interval between the integrated door panel and the front part of the cabinet to 4mm. Adjust interval between the integrated door panel of the freezer and the integrated door panel of the fridge to 5mm. Securely tighten the loose height adjust nut after adjustment. 24. Start work from Step No. 22 again after releasing the height adjust nut where the size is not matched. And adjust height of the fridge door with when interference occurs between the fridge door and the freezer door(or freezer hinge) Height Adjust Screw Forward/ Backward Top/Down Adjust Left/Right (Fig. 16) (Fig. 17) 5mm 4mm d d g d g (Fig. 18) Furniture Door of the fridge Parallel Parallel Furniture Door of the Freezer Perform work with care since you may be injured or the integrated door panel of the fridge is damaged because the hole is unmatched when installing the integrated door panel of the fridge. 6. Order of Installation 5) Work Related with the Fridge Door 10 17 25. After positioning the depth adjust bracket .. as in Figure 19, fix it with the hinge bolting screw .. (2 places) and then fix it with the top bracket bolting screw .. (4 places) (See Figure 19). depth interval (Fig. 19) (Fig. 20) c b 4 e 26. After bolting the wood bolting screw .. (4 places) to the height adjust bracket .., move the integrated door panel to the depth direction and adjust the interval to 4mm (see Figure 12). (See Figure 20). 27. Install the top bracket cover .. on the top side of the fridge, and cover the depth adjust bracket cover .. on the underside of the fridge(See Figure 21). 3 6. Order of Installation 5) Work Related with the Fridge Door (Fig. 21) .. Underside of the Fridge Door Topside of the Fridge Door 11 18 28. Insert the hinge front cover .. into the front part inside the hinge (4places). 29. Insert the air path cover .. into the square cloth support. 30. After cutting the gasket .. to suit the interval, attach it as in Figure 22, use the gasket .. on the hinge side, the gasket .. on the opposite side of hinge. 31. Insert the cap screws .. as in Figure 22 (6 places). 6. Order of Installation 6) Installation Check and Finishing Work ............ ............ .. .. Side of Refrigerator (Fig. 22) 15 15 17 1...