|
manual abstract
Drinking water quality is ensured only when the equipment is controlled within the scheduled periods. Observe the given control intervals. . Have the drinking water quality checked in regular intervals; the valid drinking water regulations are to be observed. Chemicals . Wear acid-resistant protective clothing (goggles and gloves). . Store chemicals cool and dry, however, not below 5 °C. . Keep chemicals at locations not accessible for children. . Ensure good room ventilation and provide a washing facility. . Have eye wash bottle readily available. Electrical Equipment . Work on the electrical equipment is to be carried out only by skilled persons for electrical work. . Never touch damaged or cut through mains cables; pull the mains plug immediately, as required. . Never operate the equipment with a damaged cable. 2 Intended Use The equipment is used for conditioning of surface water, well water and river water. Depending on the untreated water quality, the modular set-up enables secure separation of turbid materials, water hardeners, salts and bacteria/virus. WTC 600 LP / MP 4 Maintenance and Care Version 06/05 3 Maintenance and Care 3.1 Starting Operation Before starting operation: • Make sure that the equipment is connected to the untreated water source and the respective transporting gear, e. g., admission-pressure unit. • Ensure the unrestricted flow of the drinking water into a tank or a suitable device on the user side. 3.1.1 Admission-pressure Unit The admission-pressure unit consists of a pump (21) and a control device (22). The operating condition of the pump is indicated with three indicator lights: • Green (24): Ready for operation • Yellow (25): Pump delivering • Red (26): Malfunction or water low • The reset button (23) starts the pump after failure 3.1.2 Filling the Metering Stations • Put on protective clothing. • Open the lid (27) of the metering station (30). • Fill the respective chemical into the metering station according to Section 3.2.6. • Add the corresponding amount of chlorine-free drinking water. • Shut the lid of the metering station. • Pull the mixing rod (28) out of the metering station to the stop and push back in again. Repeat this procedure for approx. 5 minutes until the chemical is completely mixed. The equipment may be put into operation only when set-up, installed and prepared for operation by an authorized KARCHER specialist dealer. The drinking water must be able to run off without counterpressure. The height difference must not exceed 3 m. i In case an admission-pressure unit is necessary, it will be installed by a Karcher service technician. 21 22 23 24 25 26 i If the system is equipped with one or more metering stations, it must be ensured that these are correctly filled and connected. The metering stations must not be mixed up or mistaken, meaning filled with the wrong chemical. 27 28 29 30 WTC 600 LP / MP Version 06/05 Maintenance and Care If the metering container was completely empty, the metering pump (29) may have possibly drawn in air. In this case, bleed the air from the pump as described in Section 3.2.3. 3.1.3 Switching On the Equipment • Check if the pumps of the metering station, sand and activated carbon filter are connected to the respective power outlets (18 / 19) at the switch box (8). • Check if the operating mode switch (9) is in the correct position “Automatic” or “Hand”. In the “Automatic” operating mode, the system is controlled via an external float switch in the drinking water tank. i In the “Hand” operating mode, the system is switched on and off manually via the main switch. • Switch the main switch (20) to the “I” position; the system starts the drinking water production. 3.1.4 Operating Indicators Display of the controls (3 / 4) of the sand and activated carbon filters: • Display of the time • LED line: Display of the weekday Control of the RO system: The following is alternately indicated on the two-line display of the control panel (10) of the RO system: • Equipment/model No. and operating condition, • Drinking water temperature and drinking water conductance value, • Operating hours (_ _ _ _ _h _ _min). Maintenance and Care Version 06/05 WTC 600 LP / MP 3.2 During Operation Drinking water quality is ensured only when the following control intervals are met. In case deviations from the desired condition can not be eliminated through the measures mentioned, the drinking water production must be stopped and the Karcher Service must be notified. 3.2.1 Control and Corrective Action Intervals d…daily, w…weekly, m… monthly Interval Check/Activity Target/Purpose In Case of Deviation d Level, metering container Sufficient amount/filling Fill up; mixing chemicals, see Section 3.2.6 Air bubbles in metering line No air bubbles Bleed metering pump, see Section 3.2.3 Flow of drinking water based on the operational start-up value Reduction of the drinking water flow up to 10 % Fine adjustment, see Section 3.2.5 (1) Drinking water conductance value bas...
Other models in this manual:Water Systems - 600 MP (625.08 kb)