Login:
Votes - 1, Average rating: 3 ( )

User manual Rinnai, model EPD-09-0001

Manafacture: Rinnai
File size: 4.53 mb
File name:
Language of manual:en
Free link for this manual available at the bottom of the page



manual abstract


Thisdrawing is not intended to describe a complete system. It is up to thecontractor or engineer to determine the necessary components andconfiguration of the particular system to be installed. The drawing doesnot imply compliance with local building code requirements. It is theresponsibility of the engineer or contractor to ensure that the installation isin accordance with all local building codes. Confer with local buildingofficials before installation. 3 BC 53H 4 N/ O 4 N/ C 6N/ O N N/ C 6 120 VACINPUT TT COM WR 24VAC 53H 4 N/ O 4 N/ C 6N/ O N N/ C 6 120 VACINPUT TT COM WR 24VAC Tstat 120V DHWPump ZonePump DHWPumpRelay HeatingPumpRelay* * May substitute for multizone relay 120VLow voltage QboilerSingle Zone Circuit with Priority DHWNote: See pipingdiagram Single ZonePriority DHW AquastatForDHW 21 22 23 24 26 2725 B 1 2 3 4 6 75 8 9 10 12 1311 N L LN N L N CH DHW L 14 15 16 17 19 2018 N A 120VPower supply 120VExternal pump 120VExternalcontroller 120V Cylinder connectionThree way valve DHWsensor OutsideSensor BusController RoomTherm. On/Off ExternalSafetycontact 24V~ 100mA QED-09-0001 A 4 B 3 CD 4 2 SCALESIZEDATE 1 SHEET DWG NO. REV A 2 1 D Approved By NTS BA 12/ 09/ 09EL Q Series BoilerSingle Zone Circuit with Priority DHW This drawing is the exclusiveproperty of Rinnai AmericaCorporation, it may not bereproduced or given to thirdparties. 1of 1 Rinnai America Corporation103 International DrivePeachtree City, GA 302691- 800- 621- 9419 Drawn By JG Tole rance Fraction =±1/ 16" x. x= ±0.030x. xx=±0.015x. xxx= ±0.005 This is not an engineering drawing; it is intended only as a guide and notas a replacement for professional engineering project drawings. Thisdrawing is not intended to describe a complete system. It is up to thecontractor or engineer to determine the necessary components andconfiguration of the particular system to be installed. The drawing doesnot imply compliance with local building code requirements. It is theresponsibility of the engineer or contractor to ensure that the installation isin accordance with all local building codes. Confer with local buildingofficials before installation. 3 BC 53H 4 N/ O 4 N/ C 6N/ O N N/ C 6 120 VACINPUT TT COM WR 24VAC 53H 4 N/ O 4 N/ C 6N/ O N N/ C 6 120 VACINPUT TT COM WR 24VAC Tstat 120V DHWPump ZonePump DHWPumpRelay HeatingPumpRelay* * May substitute for multizone relay 120VLow voltage QboilerSingle Zone Circuit with Priority DHWNote: See pipingdiagram Single ZonePriority DHW AquastatForDHW 21 22 23 24 26 2725 B 1 2 3 4 6 75 8 9 10 12 1311 N L LN N L N CH DHW L 14 15 16 17 19 2018 N A 120VPower supply 120VExternal pump 120VExternalcontroller 120V Cylinder connectionThree way valve DHWsensor OutsideSensor BusController RoomTherm. On/Off ExternalSafetycontact 24V~ 100mA QED-09-0001 22 Boiler Applications Manual 800000026 Rev A 3 2 1 4 Cylinder connection Q boiler120V120V120V 120V Bus RoomExternal External DHW 24V~ Power supply External pump OutsideController Three way valve Therm. Safety controller 4Zone Valves with PriorityDHW sensor 100mA Sensor On/ Off contact DH NL NL NL N LCH N AB W D D 123456789 10 11 12 1314 15 16 17 18 19 2021 22 23 24 25 26 27 Note: 100% zone valve systemswith DHW should use only theZVC 406 AquastatForDHW TTT 24V stat stat Outdoor Inputstat Sensor C C MODEZONE 6 PRIORITY NORMAL RESET OFF 120V TT TT TT TT TT TT ON ZONE 1 ZONE 2 ZONE 3 ZONE 4 ZONE 5 ZONE 6 Input ZVC 406 24V 24V FUSE ( 7 AMP MAX) SIXZONEZONE VALVE CONTROLWITH OPTIONAL PRIORI TY Input MAINEXTRAN/ O COMN/ CZONE 1 ZONE 2 ZONE 3 ZONE 4 ZONE 5 ZONE 6 ENDENDSWITCH SWITCH ZONE 6 RELAY 1234 1234 1234 1234 1234 1234 B B 1 1 1 1 2222 333 3 Note: 4 wire zone valves may also be used System 120V Circulator Low voltage This drawing is the exclusive Rinnai America Corporation This is not an engineering drawing; it is intended only as a guide and not A A property of Rinnai AmericaCorporation, it may not be 103 International Drive as a replacement for professional engineering project drawings. This A Peachtree City, GA 30269 drawing is not intended to describe a complete system. It is up to the reproduced or given to third Note: 1- 800- 621-9419 parties. contractor or engineer to determine the necessary components and Q Series Boiler configuration of the particular system to be installed. The drawing does 4 Zone Valves with Priority DHW Switch position...

Other models in this manual:
Water Heaters - EPA-09-0001 (4.53 mb)
Water Heaters - QPD-09-0001 (4.53 mb)

Reviews



Your review
Your name:
Please, enter two numbers from picture:
capcha





Category