Login:
Votes - 1, Average rating: 5 ( )

User manual GSI Outdoors, model AUTOFLOW 2TF

Manafacture: GSI Outdoors
File size: 2.92 mb
File name:
Language of manual:en
Free link for this manual available at the bottom of the page



manual abstract


2) If the bin is 2.66” corrugation the hole should be centered on an outside hill. 3) If the bin is 4.00” corrugation the hole should be centered on an outside valley. 4) Use the mounting plate as a pattern and drill four 3/8” holes through the sidewall at the swich location so the place can be bolted to the bin. 5) Add foam weather strip around the top and side of the mounting plate. 6) Caulk the underside of the mounting plate, on all sides of the 2” hole, and where the plate meets the bin. 7) Bolt the mounting plate to the sidewall. 8) Attach the flex coupling to the rotary switch power pack using a roll pin. 9) Attach the 1-vane paddle to the flex coupling as shown in figure 6. 10) Apply teflon tape or pipe sealant (not included) to the rotary switch power pak threads and thread the rotary switch power pack into the mounting plate coupling. 11) Make sure that the conduit hole is facing down or is horizontal. Wet Supply Rotary Switch Mounted on Wet Supply Tan. 2000 Autoflow 22 INSTALLATION Figure 6 2000 Autoflo. INSTALLATIO. Storage Chamber High Limit Rotary Switch Installation 1) 2) Drill a 2” diameter hole through the sidewall 3’ below the fan/heater. If the bin is 2.66” corrugation the hole should be centered on an outside hill. where the plate meets the bin. 7) Bolt the mounting plate to the sidewall. 3) If the bin is 4.00” corrugation the hole should be centered on an outside 8) Attach the flex coupling to the rotary switch power pack using a roll pin. 4) 5) 6) valley. Use the mounting plate as a pattern and drill four 3/8” holes through the sidewall at the switch location so the plate can be bolted to the bin. Add foam weather strip around the top and side of the mounting plate. Caulk the underside of the mounting plate, on all sides of the 2” hole, and 9) Attach the 1-vane paddle to the flex coupling as shown in figure 7. 10) Apply teflon tape or pipe sealant (not included) to the rotary switch power pak threads and thread the rotary switch power pack into the mounting plate coupling. 11) Make sure that the conduit hole is facing down or is horizontal. Storage chamber rotary switch. 2000 Autoflow 24 INSTALLATION Figure 7 2000 Autoflo. INSTALLATIO. The three (3) Drying Chamber Rotary Switches are used by the series 2000 Autoflow to monitor the location of grain in the Drying Chamber. The rotary switch with the shortest shaft extension is the Drying Chamber Overflow Rotary Switch. It is used as a safety in the event the Chamber High Level Rotary Switch fails. The rotary switch with the longest extension is the Drying Chamber Low Level Rotary Switch. It is used to inform the computer when the peak has been covered with grain so the drying process can begin; and, will shut down if the drying chamber empties unexpectedly. The third rotary switch is the Drying Chamber High Level Rotary Switch. It is used to inform the dryer when the drying chamber is full so loading can stop. When mounting the Drying Chamber Rotary Switches some foresight is needed. The Drying Chamber Rotary Switches should be located in close proximity to one another to lessen the amount of conduit and wiring required. The rotary switches should also be mounted so that they are located in an area of the drying chamber that fills evenly with the rest of the drying chamber. The component placement on page 9 shows the placement of the Drying Chamber Rotary Switches in relation to the Fill System #1 transport auger/ downspout. The rotary switches should NOT be located in a part of the drying chamber that fills unevenly with the rest of the drying chamber. If the area of the drying chamber where the rotary switches are located fills faster that the rest of the drying chamber the drying chamber will not fill to capacity and uneven drying will result. If the area of the drying chamber where the rotary switches are located fills slower than the rest of the drying chamber an overflow situation may occur. It is very critical that the drying chamber fill evenly and that the grain falls from Fill System #1 directly onto the perforated cone in the drying chamber. Drying Chamber Rotary Switches Mounted in Bin Roof 2000 Autoflow 26 INSTALLATION Drying Chamber Low-Level Rotary Switch Installation 1) Drill a 2” diameter hole through the roof panel at the location shown in figure 8. See component placement on page 9 for proper placement in relation to fill auger. 2) Use the mounting plate as a pattern and drill four 3/8” holes through the roof panel at the switch location so the plate can be bolted to the roof. 3) Attach the flex coupling to the rotary switch power pack using a roll pin. 4) Apply teflon tape or pipe sealant (not included) to the rotary switch power pak threads and thread the rotary switch power pack into the mounting plate coupling. 5) Make sure that the conduit hole is at 6) Caulk the underside of the mounting plate and on all sides of the 2” hole. 7) Bolt the assembly to the roof panel. 8) Attach the shaft extension according to figur...

Other models in this manual:
Fans - AUTOFLOW 2TAF (2.92 mb)
Fans - AUTOFLOW 2TFC (2.92 mb)

Reviews



Your review
Your name:
Please, enter two numbers from picture:
capcha





Category