Login:
Votes - , Average rating: ( )

User manual Spalding, model 211348D

Manafacture: Spalding
File size: 503.95 kb
File name: c949d638-25e7-d9e4-59d7-1041d00b847c.pdf

Language of manual:en

The document is loading, please wait
The document is loading, please wait

manual abstract


WARNING 11. 16 4 13 9 4 7 4 10 7 4 10 7 4 16 4 7 4 9 16 4 16 TWO PERSON MINIMUM REQUIRED FOR THIS PROCEDURE. NOT FOLLOWING RECOMMENDATION MAY RESULT IN SERIOUS BODILY INJURY AND/OR PROPERTY DAMAGE. WARNING IMPORTANT! Do not over tighten. 14 14 14 1514 13 14 Cut foam stripping (14) to sizes shown and attach to flat side of H-frame (13) as shown. Then secure H-frame to support arms (9 & 10). NOTE: Install H-Frame (13) with foam striping toward backboard. Do this strip last. 11. 16 4 13 9 4 7 4 10 7 4 10 7 4 16 4 7 4 9 16 4 16 TWO PERSON MINIMUM REQUIRED FOR THIS PROCEDURE. NOT FOLLOWING RECOMMENDATION MAY RESULT IN SERIOUS BODILY INJURY AND/OR PROPERTY DAMAGE. WARNING IMPORTANT! Do not over tighten. 14 14 14 1514 13 14 Cut foam stripping (14) to sizes shown and attach to flat side of H-frame (13) as shown. Then secure H-frame to support arms (9 & 10). NOTE: Install H-Frame (13) with foam striping toward backboard. Do this strip last. 7 01/03 P/N 211348D 12. 12. Secure jack brackets (17 & 18) to lower holes in pole as shown. 7 4 17 4 18 19 19 4 4 7 REAR VIEW NOTE: REFER TO INSTRUCTION MANUAL ENCLOSED WITH ELEVATOR MECHANISM. INSTALL BACKBOARD AND GOAL AFTER INSTALLATION OF ELEVATOR MECHANISM. P/N 211348D 01/03 8 13. 13. After Installation of elevator mechanism, position H-frame assembly to lowest point. Hang backboard onto H-frame (13). NOTE: Backboard frame will rest on top of H-frame. Secure backboard with hardware as shown-*ONLY Fingertighten bolts (21) with nuts (22). Repeat procedure for opposite side. 23 22 13 TWO PERSON MINIMUM REQUIRED FOR THIS PROCEDURE. NOT FOLLOWING RECOMMENDATION MAY RESULT IN SERIOUS BODILY INJURY AND/OR PROPERTY DAMAGE. WARNING 9 01/03 P/N 211348D P/N 211348D 01/03 10 RIM ASSEMBLY & INSTALLATION WARNING 14. Install carriage bolt (41) through rim (25), washers (4) and (27) as shown. Tighten nut (43) completely. Place nut (42) about half-way up carriage bolt (41) as shown. 25 4 41 27 43 TWO PERSON MINIMUM REQUIRED FOR THIS PROCEDURE. NOT FOLLOWING RECOMMENDATION MAY RESULT IN SERIOUS BODILY INJURY AND/OR PROPERTY DAMAGE. Attach bracket (39) to backboard and support structure by inserting bolts (26) and washers (24) through top holes in bracket (39), Tighten nuts (23) completely. 26 39 24 23 15. 24 23 24 24 40 26 Insert inner bracket (40) into bracket (39) as shown. Insert bolts (26) and washers (24) through top holes of inner bracket (40) as shown, *FROM STEP 13- Now tighten backboard/frame nuts (23) completely. 16. 39 40 39 42 41 27 17. 17. Insert spacer (20) through rim assembly (25). Place rim assembly on bracket (39) so that carriage bolt (41) is inserted through hole on top of inner bracket (40). Install hex bolt (44), washers (27) and nut (42) through top holes on bracket (39) through spacer (20) as shown.Tighten completely. 2539 40 BOTTOM VIEW 20 25 41 27 44 2727 20 42 18. Install rubber grommet (28), concave washer (29) and center lock nut (30) to carriage bolt (41) as shown. NOTE Do not over tighten as rim will not flex properly. See leveling instructions to determine how much to tighten nuts (42) and (30). 28 41 30 29 11 01/03 P/N 211348D 19. LEVELING INSTRUCTIONS: Place level on rim (25) and adjust nut (42) until level. Tighten nut (30) to set rim tension for playing. LEVELING INSTRUCTIONS: Place level on rim (25) and adjust nut (42) until level. Tighten nut (30) to set rim tension for playing. 25 42 30 20. Apply logo label (33) to cover plate (31). Install cover plate (18) on rim (25) using self tapping screws (32) as shown. NOTE ORIENTATION OF COVER PLATE 31 33 32 21. Secure net (34) to rim (25). 1 2 3 34 25 OUTSIDE VIEW 4 10 feet (3.05 m) NOTE: Official rim height is 10 ft. (3.05 m) from top of rim to playing surface. P/N 211348D 01/03 12 22. 22. Check leveling at this time. Pole should be level in all directions. NOTE: If adjustment is necessary, adjust system by rotating the nuts (2) between mounting plate (3) and pole flange. (Referred to in Step 6.) After system is leveled, completely tighten nuts (7) above pole flange. 23. Apply height adjustment label (37) to front of pole as shown. IMPORTANT! If pole pad is used, position label (37) above the pole pad. 10 feet (3.05 m) REGULATION RIM HEIGHT IS 10 FEET (3.05 m). 37 13 01/03 P/N 211348D NOTE: If height adjustment is difficult to operate, you may have over tightened the areas indicated. Refer to Step 10 and Step 11. Secure pole pad (36) as shown. 24. 36 NOTE: Pole pad may NOT be included in this model. NOTE: Elevator mechanism may appear differently than shown. Height Adjustment Refer to height adjustment instructions for operating elevator mechanism. Secure pole pad (36) as shown. 24. 36 NOTE: Pole pad may NOT be included in this model. NOTE: Elevator mechanism may appear differently than shown. Height Adjustment Refer to height adjustment instructions for operating elevator mechanism. P/N 211348D 01/03 14 Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Qty. 4 8 1 34* 1 1 11 8 2 2 2 4 1 1 1 4 1 1 3 ...

Reviews



Your review
Your name:
Please, enter two numbers from picture:
capcha





Category