4 ASSEMBLY INSTRUCTIONS Occasionally our products contain components that are pre-lubricated at the factory. We recommend that you protect flooring, or anything else the parts may contact, with newspaper or cloth. water bottle with holder computer book holder AC adapter foot platform stationary handlebar foot platform snap caps vertical stabilizer bar right swing arm left swing arm main frame assembly right roller tube left roller tube right armleft arm left and right swing arm covers bushing caps rear foot tube vertical column cover column multi hex tool with phillips screwdriver M8 x 60mm allen bolts M8 washers and M8 nylon nuts allen wrench 13mm 15mm 17mm 6mm heart rate Fastener chest strap Pack Tools Required: (included) Multi Hex Tool with Phillips Screwdriver heart rate receiver Allen Wrench 6 6 right roller tube left roller tube roller tracks foot base main frame assembly stabilizer bar and washers 1a 1a 1a STEP 2 – Foot Platform Assembly NOTE: The Foot Platforms are interchangeable a) Remove the Allen Bolts, Washers and Nylon Nuts from the bottom of the Foot Platform. b) Note: This Step might be easier if you have a second person hold the Foot Tube or Foot Platform steady as you slide the Foot Platform on and secure it. Position the Crank in the down stroke and carefully slide the Foot Platform Assembly onto the Front Foot Tube. Replace the Bolts and Washers you just removed in step (a). Tighten with Wrench provided. c) Carefully lay the Foot Platform down so the Roller seats itself into the Roller Track on the Roller Tube. Repeat on other side. Roller should seat itself in track 2c front foot tube foot platform assembly main frame connecting arm crank (in down stroke) 2b STEP 1 – Main Frame Assembly a) Remove the Allen Bolts, Washers, Nuts and Nut Caps from the Foot Base on the Main Frame Assembly. Slip the Roller Tubes onto the Main Frame making sure the Roller Tracks are facing up and the Bolt Holes on the rear of the Roller Tubes are facing each other. To secure the Roller Tubes to the Base Frame replace the Bolts and Washers you just removed. b) Remove the Allen Bolts and Washers from the rear of the Roller Tubes. Place the Stabilizer Bar (with the Warning Label up) between the Roller Tubes. Replace the Bolts and Washers you just removed. c) Tighten all bolts with Wrench provided. 1b remove bolts STEP 3 – Vertical Column Assembly a) Remove the two Allen Bolts, Washers and Phillips Screw from the Vertical Column. b) Slip the Vertical Column Cover onto the Vertical Column as shown. The Vertical Column should lean back towards the Foot Platforms. c) Remove the wire tie from the wires inside the Main Frame Assembly where the Vertical Column will go. Attach the three wires from the Main Frame Assembly to the three wires coming out the bottom of the Vertical Column. d) Insert the Vertical Column into the Main Frame Assembly. Reinsert the Allen Bolts and Washers you removed in (a). Be careful not to pinch the wires. Gently pull the wires up from the top of the Handlebar Tube to prevent any slack in the wires at the base of the Handlebar Tube. Hand tighten. e) Secure the Vertical Column in place with the three Allen Bolts, Washers and Nylon Nuts from the Fastener Pack. Tighten with the Wrench provided. Also tighten the bolts used in step (d). f) Let the Vertical Column Cover slip into place. Push it down gently until it clicks. Secure in place with the Phillips Screw you removed in (a). M8 x 60mm allen bolts, M8 washers and M8 nylon nuts 3d 3c 3e 3b 3d 3a STEP 3 – Vertical Column Assembly a) Remove the two Allen Bolts, Washers and Phillips Screw from the Vertical Column. b) Slip the Vertical Column Cover onto the Vertical Column as shown. The Vertical Column should lean back towards the Foot Platforms. c) Remove the wire tie from the wires inside the Main Frame Assembly where the Vertical Column will go. Attach the three wires from the Main Frame Assembly to the three wires coming out the bottom of the Vertical Column. d) Insert the Vertical Column into the Main Frame Assembly. Reinsert the Allen Bolts and Washers you removed in (a). Be careful not to pinch the wires. Gently pull the wires up from the top of the Handlebar Tube to prevent any slack in the wires at the base of the Handlebar Tube. Hand tighten. e) Secure the Vertical Column in place with the three Allen Bolts, Washers and Nylon Nuts from the Fastener Pack. Tighten with the Wrench provided. Also tighten the bolts used in step (d). f) Let the Vertical Column Cover slip into place. Push it down gently until it clicks. Secure in place with the Phillips Screw you removed in (a). M8 x 60mm allen bolts, M8 washers and M8 nylon nuts 3d 3c 3e 3b 3d 3a put on left swing arm, large washer, bushing cap, small washers, nut and snap cap main frame assembly left swing arm vertical column connecting arm wires right arm a) Nut and tighten. b) c) left side of unit shown 4d 4c swing arm cover nylon nut and washer go on inside of swing arm, as you tighten, t...