Login:
Votes - 4, Average rating: 3.3 ( )

User manual Frymaster, model Heated Pass Through none

Manafacture: Frymaster
File size: 486.37 kb
File name: 51bec019-3bfc-4c0a-84ae-4ed4ccbf80fe.pdf
Language of manual:en
Free link for this manual available at the bottom of the page



manual abstract


Parts Ordering and Service Information Parts orders may be placed directly with your local Frymaster Factory Authorized Service Center (FASC)/Distributor. A list of Frymaster FASC/ Distributors was included with the unit when shipped from the factory. Your nearest FASC can also be found on Frymaster’s Web site, Frymaster.com. or you can contact the Frymaster Service Department at 1-800-24-FRYER or 1-318865- 1711. To speed up your order, the following information is required: Model Number _________________________ Serial Number _________________________ Voltage_______________________________ Item Part Number_______________________ Quantity Needed _______________________ Service may be obtained by contacting your local Frymaster Authorized Service Center/Distributor. Service information may be obtained by calling the Frymaster Service Department. The following information will be needed in order to assist you quickly and efficiently: Model Number _________________________ Serial Number _________________________ Nature of theProblem_____________________________________________________________ Also include any other information which may be helpful in solving your service problem. RETAIN AND STORE THIS MANUAL IN THE EQUIPMENT MANUAL FOR FUTURE USE. 2. General The Heated Pass Through or HPT is designed to hold assembled sandwiches. By circulating heated air evenly across the open staging area, the unit keeps sandwiches hot without drying or cooking. 3. Installation/Set Up Upon arrival, inspect the HPT for concealed damage. Immediately report any damage to the delivering freight company. Claims must be filed within 15 days after receipt of the unit. Make sure that the unit is placed on an even surface and that the area surrounding the HPT is free of clutter that would interfere with airflow. Install the Filter Screen The filter screen is designed to prevent debris from entering the cowl assembly and clogging the blower. Slip the part over the vent opening on the ON/OFF switch side of the unit. The filter screen snaps into position. If it is equipped with an optional holding screw, tighten the screw to pull the The filter screen snaps into place on the air-intake filter screen snug into position. tower. 1 HEATED PASS THROUGH INSTALLATION, OPERATION, SERVICE, AND PARTS Power Requirements: • Voltage – 208 VAC • Frequency - 60 Hz • Single Phase • 20 amp Service 4. Operation 1. Plug the unit into the power source. * 2. Press the ON/OFF rocker switch to the ON position. 3. Place product in the HPT in accordance with the restaurant’s established procedures. Heated air flows from the air tower across the plate and into the cowl. Plate ON/OFF Switch THIS APPLIANCE IS EQUIPPED WITH A GROUNDING PLUG FOR YOUR PROTECTION AGAINST SHOCK HAZARD AND MUST BE PLUGGED INTO A PROPERLY GROUNDED RECEPTACLE. DO NOT CUT OR REMOVE THE GROUNDING PRONG.FROM THIS PLUG. Air Tower Power Cord Cowl Blower Plate Air flow through the HPT 2 HEATED PASS THROUGH INSTALLATION, OPERATION, SERVICE, AND PARTS 5. Maintenance Daily 1. Remove all product and turn the unit off. 2. Allow the unit to cool. 3. Use a wet sanitized cloth to clean the heated surfaces of the unit. Use a nylon pot brush on hard to remove stains or food items. Monthly Remove the filter screen and clean it with a wet sanitized cloth. Dry the screen thoroughly before reinstalling it in the unit. 6. Service Procedures 6.1 Adjusting the Temperature A. Disconnect the unit from the electrical power source. This is imperative. Line voltage is accessable on the controller board with the unit connected to the power source. B. A potentiometer regulates the heat produced by the air heater. It is mounted on the HPT’s controller board and is accessible through a slot in the left side of the cowl assembly (see Figure 1 below). NOTE: The filter screen must first be removed. Figure 1: The potentiometer is accessible through the vent in the cowl assembly indicated by the arrow. C. Use a long, narrow-blade screwdriver to turn the potentiometer clockwise to increase the temperature; turn it counterclockwise to lower the temperature. Figure 2: The potentiometer, indicated by the arrow, is adjusted using a narrow-blade screwdriver. D. Reconnect the HPT to the power source and check temperature. 3 HEATED PASS THROUGH INSTALLATION, OPERATION, SERVICE, AND PARTS 6.2 Replacing the Temperature Probe or High Limit Thermostat A. Disconnect the unit from the electrical power source. B. Turn the unit on its side. Remove the five screws from the chassis bottom. C. Set the unit down on its base. D. Carefully lift the cowl assembly upward until it is clear of the blower assembly, then lay it on the table behind unit. E. The air tower has two sections – a removable front section and the fixed rear section. The front section must be removed to access the temperature probe and high limit thermostat. A pair of slotted brackets, one at each end, holds the front section in place. Insert a 5.16-inch nut driver through the ...


Reviews



Your review
Your name:
Please, enter two numbers from picture:
capcha





Category