|
manual abstract
nAutomatic Water Level Control System with Low Water Power Cut-off Circuit. nSteam generator equipped with High Limit Pressure Safety Switch, 15 psi Safety Valve, and Steam Generator Pressure Gauge. nSecondary Low Water Cut-Off, factory installed (CALE) (Required for AZ. AR. CA. CO. CT. DE. FL. GA. HI. IL. IA. KS. MD. MA. MI. MN. MT. NE. NV. NM. NC. OK. OR. PR. RI. TN. UT. VA. WA. WV., Buffalo, NY, Wash. DC) nNSF Certified 6. Stainless Steel Legs with adjustable flanged feet for a one inch level adjustment. nStandard voltage 208 or 240 volts, 60 Hz, 3 phase. nAll Controls are serviceable from the front. Shall be Two Compartments, CLEVELAND Convection Steamer, Model 24- CEM- _____ , Electric Steam Generator, _____KW, _____ volts, _____ phase, 3 wire. Solid State Controls operate timing, water level and safety functions. Electric Steam Generator with Automatic Water Fill on start-up and Automatic Blowdown with additional Manual Drain Valve, For each cooking compart- ment: 60 minute Mechanical Timer, Manual Operation Mode and Cold Water Condenser. Type 304 Stainless Steel cooking compartment. Options & Accessories pRight Hand Door Hinging, Controls on the Left (DHR) pElectronic Timer with Compensating Load Feature (ETC) pON/OFF Steam Switch only for compartment controls (MC) pCafeteria pans in depths of 1., 21.2., 4. and 6. pVoltages other than standard pPower Take Off Kit (EPTO), Kettle Interconnecting Kit (IMK) pCorrectional Packages pStainless Steel Base Frame (FSS) pCompartment Door Steam Shut Off Switch (SCS) pBoiler Descaling Pump Kit (107142) pWater Filters Short Form Specifications SECT. III PAGE 1 0707 Cleveland Classic Series TWO COMPARTMENT, PRESSURELESS ELECTRIC STEAM GENERATOR 24, 36 OR 48 KW, 24” WIDE CABINET BASE DESIGN CONVECTION STEAMERS (NOT TO SCALE) SECT. III PAGE 2 0707 Litho in U.S.A. Each compartment has capacity for: • Three, 12. x 20. x 21.2. or six, 12. x 20. x 1. deep Cafeteria Pans. WATER QUALITY REQUIREMENT The recommended minimum water quality standards whether untreated or pre-treated, based upon 10 hours of use per day, and a Daily Blowdown, are as follows: TOTAL DISSOLVED SOLIDS less than 60 parts per million TOTAL ALKALINITY less than 20 parts per million SILICA less than 13 parts per million pH FACTOR greater than 7.5 CHLORINE less than 30 parts per million Consult a local water treatment specialist for an on site water analysis for recommendations concerning steam generator feed water treatment (if required), in order to remove or reduce harmful concentrations of minerals. The use of highly mineralized water will mean that more frequent servicing of the steam generator will be necessary. The fact that a water supply is potable is not proof that it will be suitable for the generator. KW Volts Watts Ph Amps Wire 24 208 21,500 1 103.4 2 220 24,000 1 109.1 2 240 24,000 1 100.0 2 440 20,200 1 45.9 2 480 24,000 1 50.0 2 208 21,500 3 59.7 3 220 24,000 3 63.1 3 240 24,000 3 57.8 3 440 20,200 3 26.5 3 480 24,000 3 28.9 3 600 24,000 3 23.1 3 360 21,500 3 34.5 4 380 24,000 3 36.5 4 415 24,000 3 33.4 4 KW Volts Watts Ph Amps Wire 36 208 32,200 3 89.5 3 220 36,000 3 94.6 3 240 36,000 3 86.7 3 440 30,200 3 39.7 3 480 36,000 3 43.4 3 600 36,000 3 34.7 3 360 32,200 3 51.7 4 380 36,000 3 54.8 4 415 36,000 3 50.1 4 48 208 42,900 3 119.2 3 220 48,000 3 126.1 3 240 48,000 3 115.6 3 440 40,300 3 52.9 3 480 48,000 3 57.8 3 600 48,000 3 46.2 3 360 42,900 3 68.9 4 380 48,000 3 73.0 4 415 48,000 3 66.9 4 ELECTRIC WATER DRAINAGE CLEARANCE CD The Floor Drain must be located outside the confines of the equipment base. 1 1/2. I.P.S. common drain. Do not connect other units to this drain. Do not use PVC pipe for drain. 1/4. NPT Cold Water Inlet 35 psi minimum 60 psi maximum Right - 3”, Left - 3”, Rear - 3” (12” on control side if adjoin- ing wall or equipment is over 30” high for service acess) Contact factory for variances to clearances. NOTES: Cleveland Rang...
Other models in this manual:Food Steamers - 24-CEM-48 (88.6 kb)
Food Steamers - 24-CEM-24 (88.6 kb)