Login:
Votes - 2, Average rating: 3.5 ( )

User manual Manitowoc Ice, model Q-0420

Manafacture: Manitowoc Ice
File size: 119.93 kb
File name:
Language of manual:en
Free link for this manual available at the bottom of the page



manual abstract


4. Pull evaporator away from bulkhead. Place bottom of mylar strip in sump trough and slip up behind evaporator (align slot cut in step 3 with bin switch wire). Mylar must extend above bottom evaporator mounting screw (approximately 2” above gasket/bulkhead joint). 5. Remove paper backing from mylar. Apply tension to mylar to eliminate wrinkles. 6. Align evaporator extrusion and bulkhead screw holes; puncture mylar for the bottom screw holes and insert screws. Install all remaining evaporator screws. 7. Puncture mylar and insert screws removed in step 2. Bulkhead and Sidewall Insulation 1. Using the supplied insulation as a template, cut and remove the fiberglass insulation (approximately 9” from base to top of cut). Using a putty knife, scrape insulation and glue from the bottom of the bulkhead on the rear and both sides. 2. Remove upper white backing to expose tape surface (do not remove backing below slit at bottom). Slide the insulation down into the base and then press the insulation against the bulkhead to secure. Insulation must bottom out on the base and be tight to the fiberglass insulation. 3. Repeat step 2 on the left side bulkhead. 4. The back panel insulation will rest in a bed of silicone. Apply a continuos bead of black silicone sealant to the base of the ice machine next to the bulkhead wall. 5. Peel the white backing off of the insulation for the back bulkhead (9” x 21 1/2”). Align the slots in the insulation with the ridges in the base. Press the insulation against the bulkhead to secure. The insulation will overlap the left and right side insulation installed earlier. Ensure that the foam and fiberglass insulation mates flush with no voids. 6. Peel the white backing off of the 3” x 21 1/2” strip of insulation and install over the bottom section of the 9” x 21 1/2” insulation installed in step 5. Align cut slots with the back bulkhead insulation and press to seal. 8005503 Sheet 2 of 3 06/22/00 Insulation must extend all the way into the base. 7. Use black silicone sealant to seal insulation to the base, foam insulation to foam insulation joints, and any voids where insulation meets or overlaps. Add bulkhead corner insulation covers where the rear bulkhead and side panel corners meet. 8. Verify no moisture is present in the suction line tubing. If moisture is present, drain and dry the insulation and reinstall following step 10 instructions. 9. Install armaflex insulation over the existing insulation on suction line. Use 3/4” x 3/8” insulation on the evaporator outlet and inlet tubing and 2” x 3/8” on the rest of the suction line. Use suitable glue to seal insulation airtight (do not use electrical tape). Seal the ends of the insulation with wire ties. 10. Remove clear vinyl tube from dump valve and brass wing adapter. Install armaflex insulation over tube and then reinstall tube to dump valve and adapter. Ensure white clamps are secure to prevent water from leaking. 8005503 Sheet 3 of 3 06/22/00 7. Seal insulation to base with silicone sealant 5. Align insulation slits with base ribbing 10. Insulate drain line 4. Apply bead of silicone before applying insulation 9. Install additional ins...

Other models in this manual:
Water and Air Pumps - Q-0320 (119.93 kb)

Reviews



Your review
Your name:
Please, enter two numbers from picture:
capcha





Category