D403,750 REMOVE ALL BURRS AND BEVEL TEMPLATE FOR SPOUT ROLL PIN LOCATION 3/16" DIA. HOLE 20.5mm (13/16") 1"- 2" FRONT Complete FINISHED DECK (A) before trim installation. Turn off the water supplies. Remove the GUARDS (1) from the VALVE BODIES (2). Remove the SPOUT GUARD (3) and 1/4" PLUG (4) from the SPOUT SHANK (5). The SPOUT SHANK (6) height should be 1" to 2" above the FINISHED DECK (A). Cut the SPOUT SHANK (5) if necessary. Remove all burrs and bevel the end of the shank. Failure to do so m