Manafacture: Hobie
File size: 170.94 kb
File name: 30113.pdf
Language of manual:
The document is loading, please wait
|
The document is loading, please wait
manual abstract
For 17, 18, 20 & 21 installation... trim to 2”. 4) Drills needed: 15/64” when using caps. 3/16” for rivets only. NOTE: Bearing must be placed - open side towards center of float. H-14 / H-16 H-17 / H-18 / H-20 / H-21 Position as shown. Be sure Float has complete 360 degree rotation. Drill mast and rivet single (long rivet with cap) to hold location. Bend eye straps to conform to your mast curve. Rivet lower strap (use shorter rivets and seal caps). Rivet upper strap (without seal caps) (use long rivets for 17, 18, 20 & 21), this is above seal....
Other models in this manual:Boats - 30113 (170.94 kb)