Login:
Votes - 2, Average rating: 4.5 ( )

User manual Bard, model WA491

Manafacture: Bard
File size: 311.62 kb
File name:
Language of manual:en
Free link for this manual available at the bottom of the page



manual abstract


6. Position unit in opening and secure with 5/16 lag bolts; use 7/8 inch diameter flat washers on the lag bolts. 7. Secure rain flashing to wall and caulk across entire length of top. See Figure 3. 8. For additional mounting rigidity, the return air and supply air frames or collars can be drilled and screwed or welded to the structural wall itself (depending upon wall construction). Be sure to observe required clearance if combustible wall. 9. On side by side installations, maintain a minimum of 20 inches clearance on right side to allow access to control panel and heat strips, and to allow proper airflow to the outdoor coil. Additional clearance may be required to meet local or national codes. Manual 2100-398 Page 7 Manual 2100-398 Page 8 FIGURE 3 MOUNTING INSTRUCTIONS MIS-416 FIGURE 4 ELECTRIC HEAT CLEARANCE SIDE SECTION VIEW OF SUPPLY AIR DUCT FOR WALL MOUNTED UNIT SHOWING 1/4 INCH CLEARANCE TO COMBUSTIBLE SURFACES. MIS-277 WARNING A minimum of 1/4 inch clearance must be maintained between the supply air duct and combustible materials. This is required for the first 3 feet of ducting. It is important to insure that the 1/4 inch minimum spacing is maintained at all points. Failure to do this could result in overheating the combustible material and may result in a fire causing damage, injury or death. Manual 2100-398 Page 9 Manual 2100-398 Page 10 FIGURE 5 WALL MOUNTING INSTRUCTIONS FIGURE 6 WALL MOUNTING INSTRUCTIONS MIS-548 MIS-549 SEE FIGURE 3 – MOUNTING INSTRUCTIONS SUPPLY AIR OPENING RETURN AIR OPENING RETURN AIR OPENING SUPPLY AIR OPENING BOTTOM MOUNTING BRACKET. MOUNT ON WALL BEFORE INSTALLING UNIT. RETURN AIR OPENING SUPPLY AIR OPENING WALL STRUCTURE FACTORY SUPPLIED RAIN FLASHING. MOUNT ON UNIT BEFORE INSTALLATION SEE UNIT DIMENSIONS, FIGURE 1, FOR ACTUAL DIMENSIONS ATTACH TO TOP PLATE OF WALL 1.000” CLEARANCE ALL AROUND INTERIOR FINISHED WALL OVER FRAME 1.000” CLEARANCE ALL AROUND EXTERIOR FINISHED WALL OVER FRAME ATTACH TO BOTTOM FRAMING MATERIAL PLATE OF WALL 2 X 4’S, 2 X 6’S AND/OR STRUCTURAL STEEL THIS STRUCTURAL MEMBER LOCATED TO MATCH STUD SPACING FOR REST OF WALL. A SECOND MEMBER MAY BE REQUIRED FOR SOME WALLS. RETURN DUCT OPENING SUPPLY DUCT OPENING Manual 2100-398 Page 11 FIGURE 7 COMMON WALL MOUNTING INSTALLATIONS FREE AIR FLOW NO DUCT DUCTED SUPPLY RETURN AT UNIT FALSE WALL INSTALLATION CLOSET INSTALLATION MIS-550 WIRING – MAIN POWER Refer to the unit rating plate for wire sizing information and maximum fuse or “HACR” type circuit breaker size. Each outdoor unit is marked with a “Minimum Circuit Ampacity”. This means that the field wiring used must be sized to carry that amount of current. Depending on the installed KW of electric heat, there may be two field power circuits required. If this is the case, the unit serial plate will so indicate. All models are suitable only for connection with copper wire. Each unit and/or wiring diagram will be marked “Use Copper Conductors Only”. These instructions must be adhered to. Refer to the National Electrical Code (NEC) for complete current carrying capacity data on the various insulation grades of wiring material. All wiring muse conform to NEC and all local codes. The electrical data lists fuse and wire sizes (75° C copper) for all models including the most commonly used heater sizes. Also shown are the number of field power circuits required for the various models with heaters. The unit rating plate lists a “Maximum Time Delay Relay Fuse” or “HACR” type circuit breaker that is to be used with the equipment. The correct size must be used for proper circuit protection and also to assure that there will be no nuisance tripping due to the momentary high starting current of the compressor motor. The disconnect access door on this unit may be locked to prevent unauthorized access to the disconnect. To convert for the locking capability bend the tab located in the bottom left hand corner of the disconnect opening under the disconnect access panel straight out. This tab will now line up with the slot in the door. When shut a padlock may be placed through the hole in the tab preventing entry. See “Start Up” section for important information on three phase scroll compressor start ups. WIRING – LOW VOLTAGE WIRING 230 / 208V, 1 phase and 3 phase equipment dual primary voltage transformers. All equipment leaves the factory wired on 240V tap. For 208V operation, reconnect from 240V to 208V tap. The acceptable operating voltage range for the 240 and 208V taps are: TAP RANGE 240 253 – 216 208 220 – 187 NOTE: The voltage should be measured at the field power connection point in the unit and while the unit is operating at full load (maximum amperage operating condition). Five (5) wires should be run from thermostat subbase to the 24V terminal board in the unit. A five conductor, 18 gauge copper, color-coded thermostat cable is recommended. The connection points are shown in Figure 8: TABLE 3 THERMOSTAT WIRE SIZE Maximum Transformer Distance VA FLA Wire Gauge ...

Other models in this manual:
Air Conditioner & Split Systems - WA381 (311.62 kb)
Air Conditioner & Split Systems - WA423 (311.62 kb)
Air Conditioner & Split Systems - WA484 (311.62 kb)
Air Conditioner & Split Systems - WA602 (311.62 kb)

Reviews



Your review
Your name:
Please, enter two numbers from picture:
capcha





Category