Login:
Votes - , Average rating: ( )

User manual HP, model HP ProLiant XL220a Gen8 v2 Server

Manafacture: HP
File size: 514.27 kb
File name:

Language of manual:en

The document is loading, please wait
The document is loading, please wait


Other manuals for this model:

manual abstract















HP Apol o a6000 5U Chassis
Overview

Rack rail installation depends on your rack configuration. Be sure to
WARNING: If you are going to use a lift, be sure to use a
follow the appropriate markings on the rack rails and select the correct
Rail in HP Racks
lift that can handle the load of the component.
image for your setup.
This document provides instructions for instal ing the HP Apollo a6000


5U Chassis Rail kit.
Installation Instructions

Anti-tip stabilizer


Hardware kit contents

The anti-tip stabilizers provide stability and support when equipment is

instal ed, removed or accessed within the rack. Stabilizer kits are
available in both 600-mm and 800-mm versions. HP also recommends
using the side feet, provided with these kits, to stabilize stand-alone
racks from the other side. If you are stabilizing racks that are secured
together with baying kits, the side feet are optional on either end of the
row.
HP recommends that stabilizer option kits be used when one or more of
the following situations occur:

The standard 600-mm (23.62-in) or 800-mm (31.50-in) front foot
is required with deployments of stand-alone racks.


Side feet, which are included in the stabilizer kits, are

recommended to be instal ed as well.

Rack rows with four or more bayed racks, without a single
rack-mountable component exceeding 99.79 kg (220 lb), do not need
a stabilizer kit installed.



Item
Hardware (Scale: 1:1)
Quantity/Tool
Important safety information
A
6 Alignment pins T-15

See the Important Safety Information document included with the
Torx
server.
B
4 10-32 Panhead

shoulder screws T-25
CAUTION: Electrostatic discharge (ESD) can damage

electronic components. Be sure that you are properly

Torx
grounded (earthed) before beginning any instal ation
C
4 Square-hole cage nuts
procedure.




D
Installing the product in a rack
8 10-32 Flathead screws
T-15 Torx

The following procedure has steps that contain two images. Each
E
8 10-32 Slot ed screws
image illustrates a rack unit alignment method for installing the rack
T-25 Torx
rails:


The top image illustrates a full U rack unit installation.

Extra hardware might be included for your convenience.

The bottom image illustrates a 1/2 U rack unit installation.

Instal ation Information
This hardware kit only supports HP Standard square-hole racks.

© Copyright 2014 Hewlet -Packard Development Company, L.P.
Rack warnings

The information contained herein is subject to change without notice. The only
WARNING: To reduce the risk of personal injury or
warranties for HP products and services are set forth in the express warranty
damage to the equipment, be sure that:
statements accompanying such products and services. Nothing herein should
be construed as constituting an additional warranty. HP shall not be liable for
• The leveling jacks are extended to the floor.
technical or editorial errors or omissions contained herein.
• The ful weight of the rack rests on the leveling jacks.
• The stabilizing feet are attached to the rack if it is a
single-rack installation.
• The racks are coupled together in multiple-rack
Part Number: 752052-001
installations.
May 2014
*752052-001*
• Only one component is extended at a time. A rack may
Edition: 1
752052-001
become unstable if more than one component is
extended for any reason.


...

Reviews



Your review
Your name:
Please, enter two numbers from picture:
capcha





Category