Take out all the parts and compare them to the diagrams below. Be sure you have all the parts and can identify them. • You will need a Phillips or flat head screw driver. • A helping hand is always good. Assemble your mantel with an adult assistant if possible. Some pieces are heavy and will need to be held by a helper. Assembly time will take approximately 30-60 minutes. FLAT HEAD SCREW(4*25mm)19PCS 1 2 3 4 5 6 1 1 1 1 1 1 RIGHT SIDE PANEL MODEL MEF2021WL ITEM NAME PART NO. MANTEL PART NAME QTY. BASE CENTRAL HEADER RIGHT FRONT PANEL LEFT SIDE PANEL LEFT FRONT PANEL 7 TOP 1 RIGHT SIDE PANEL CENTRAL HEADER RIGHT FRONT PANEL LEFT SIDE PANEL LEFT FRONT PANEL 1 5 7 3 6 240 225 924 75 2PCS 2PCS flat head screws ANTI-TIP DEVICE 2 SETS Includes 1 spa re 19PCS 2PCS 2PCS 4PCS 4PCS 4PCS TOP 1PC WALNUT: ZZ.2021WL.07 BASE 1PC WALNUT: ZZ.2021WL.01 CENTRAL HEADER 1PC WALNUT: ZZ.2021WL.06 LEFT front pane l 1PC WALNUT: ZZ.2021WL.05 INSIDE VIEW OUTSIDE VIEW LEFT side pane l 1PC WALNUT: ZZ.2021WL.03 RIGHT front pane l 1PC WALNUT: ZZ.2021WL.04 RIGHT side pane l 1PC WALNUT: ZZ.2021WL.02 SCREW(4*25mm)19PCS CENTRAL HEADER RIGHT FRONT PANEL LEFT SIDE PANEL LEFT FRONT PANEL 924 2PCS 2PCS FLAT HEAD SCREW(4*25mm)19PCS RIGHT SIDE PANEL BASE RIGHT FRONT PANEL LEFT SIDE PANEL TOP 800 225 924 75 476 610 2PCS FLAT HEAD SCREW(4*25mm)19PCS RIGHT SIDE PANEL BASE RIGHT FRONT PANEL LEFT SIDE PANEL LEFT TOP 800 225 924 75 476 610 2PCS FLAT HEAD SCREW(RIGHT SIDE PANEL BASE TOP 800 225 924 75 476 610 FLAT HEAD SCREW(4*25mm)19PCS RIGHT SIDE PANEL BASE RIGHT FRONT PANEL LEFT SIDE PANEL LEFT FRONT PANEL TOP 2PCS 4PCS FLAT HEAD SCREW(FLAT HEAD SCREW(4*16mm)4PCS 1 Get Ready to Start Before assembly, use scissors to unwrap the parts from the packaging. DO NOT use a box cutter or exacto-knife as you may cut into the mantel pieces inside the box and damage the finish. Check for the hardware bag which is RED and located inside the packaging, taped to the top box. Be sure you DO NOT discard any pieces. Step 1 Locate the base and place it on the floor. Do not put it up against he wall at this point in the assembly, as you need to get in behind he mantel. Step 2 Locate the left side panel and the left front panel. Facing the front of the base, take the left side panel, positioning it so the holes in the blocks on the bottom line up with the holes on the base. Position the left front panel next to the left side panel, lining up the holes in the blocks with the holes on the base. Attach the left front and side panel to the base by inserting and tightening 1 flat head screw to each piece. Attach the left side and front panels together by inserting and tightening 3 flat head screws. Step 3 Repeat Step 2, but with the right side panel and the right front panel. Step 4 Locate the central header that will be attached to the left and right legs and will sit above the firebox. Position this panel with the finished side facing the front of the mantel. Line up the holes on each side and insert and tighten 2 flat head screws on each side. Step 5 Get your assistant and locate the top of your mantel. This top is very heavy. It will take 2 people to lift and position it in place. Ensure the top goes over the positioning guide located on the header. The top must go over this guide to be positioned correctly. Line up the holes on the top of the mantel, insert and tighten 4 flat head screws. 2 RIGHT SIDE BASE TOP 4PCS FLAT HEAD 1 1 1 1 1 1 PANEL MEF2021WL MANTEL NAME QTY. BASE CENTRAL HEADER FRONT PANEL PANEL FRONT PANEL 1 CENTRAL HEADER PANEL LEFT FRONT PANEL 1 2 4 5 7 3 6 1 2 4 5 7 3 6 2 4 Step 1 Step 2 & 3 Step 4 Step 5 step 6 Take your electric firebox out of its packaging and position it between the 2 legs of the mantel. Once you are close to the wall, plug the firebox into the nearest outlet. step 6 Takeyourelectricfireboxoutofitspackagingandpositionitbetweenthe2legsofthemantel.Onceyouareclosetothewall,plugthefireboxintothenearestoutlet. The firebox comes with 3 metal brackets and 20 black screws. These metal brackets must be attached to both the sides of the firebox and the mantel to ensure that your firebox does not move around as you use it. 2 of the brackets have 2 large holes on one side. These large holes line up with 2 screws on the side of the firebox. The other screws provided must be inserted into the holes at the other end of the bracket and into the firebox. The other side of each bracket attaches to the mantel. The 3rd bracket has no holes on 1 side. That side should go up against the firebox top but should not be attached as the heater sits right underneath the bracket. Only the mantel side should be attached. If you have any questions about the firebox please reference the installation instructions that come with the firebox. Please reference the Quick Tips section of that instruction manual. step 7 You are now ready to position your mantel against the wall. This step requires 2 people to move the unit. anti-tipping device At this point you must attach t...