|
manual abstract
TERMINATION HEIGHTS FOR VENTS ABOVE FLAT OR SLOPED ROOFS Horizontal Overhang 12 X Roof Pitch is X/12 2 FT MIN.2 FT MIN. Lowest Discharge Opening H* Vertical Wall Vent Termination Storm Collar Flashing 1 inch (25.4 mm) Minimum Clearance to Combustibles Concentric *H = MINIMUM HEIGHT FROM ROOF TO Vent Pipe LOWEST DISCHARGE OPENING OF VENT Roof Pitch H (feet) Flat to 6/12 1.0 Over 6/12 to 7/12 1.25 Over 7/12 to 8/12 1.5 Over 8/12 to 9/12 2.0 Over 9/12 to 10/12 2.5 Over10/12 to 11/12 3.25 Over 11/12 to 12/12 4.0 Figure 4 Terminate multiple vent terminations according to the installation codes listed at the top of this page. Horizontal Vent Termination Clearances The horizontal vent termination must have a minimum of 3" (76 mm) clearance to any overhead combustible projection of 2 ..." (64 mm) or less. See Figure 5. For projections exceeding 2 ..." (64 mm), see Figure 5. For additional vent location restrictions refer to Figure 7 on page 6. TYPICAL INSTALLATION SEQUENCE The typical sequence of installation follows, however, each installation is unique resulting in variations to those described. See the page numbers references in the following steps for detailed procedures. Step 1. (page 5) Construct the appliance framing. Position the appliance within the framing and secure with nailing brackets. Horizontal Vent Termination Clearances Combustible Projection See Figure 31or 32 for the recess allowances, into exterior walls, of the round and square horizontal terminations. 3" (76 mm)12" (305 mm) Termination Kit Combustible Projectiongreater than 2... inches in length 2... inches or less in length 18" (457 mm) Ventilated Soffit Unventilated Soffit Figure 5 -Side Elevation View Step 2. (page 5) Route gas supply line to appliance location. Step 3. (page 8) Install the vent system and exterior termination. Step 4. (page 20) Field Wiring Millivolt Appliances – The operating control switch is factory installed. Step 5. (page 20) Install blower kit (optional equipment). Step 6. (page 21) Make connection to gas supply. Step 7. (page 22) Install the logs, vermiculite and glowing embers. Step 8. (page 22) Checkout appliance operation. Step 9. (page 22) Install glass door frame assembly. Step 10. (page 23) Adjust burner to ensure proper flame appearance. Step 11. (page 23) Install the hoods. DETAILED INSTALLATION STEPS The appliance is shipped with all gas controls and components installed and pre-wired. Remove the shipping carton, exposing the front glass door. Remove the top panel. Remove the cardboard from underneath the pressure relief plates. Gently depress the outer top corners of the access panel until the catches "pop" the panel free, allowing it to swing out and down to open. Open the two latches (located under the firebox floor) securing the glass door. Remove the door by tilting it outward at the bottom and lifting it up. Set the door aside protecting it from inadvertent damage. See Figure 50on page 21.Remove the two cardboard pad strips from between the firebox subfloor and the firebox sides. NOTE: DIAGRAMS & ILLUSTRATIONS NOT TO SCALE. Step 1. FRAMING Frame these appliances as illustrated in Figures 8 on page 7,unless the appliance is to be installed in a corner.See Figure 9 on page 7 for corner framing installations. All framing details must allow for a minimum clearance to combustible framing members as shown in Table 2 on page 4. If the appliance is to be elevated above floor level, a solid continuous platform must be constructed. Headers may be in direct contact with the appliance top spacers but must not be supported by them or notched to fit around them. All construction above the appliance must be self supporting, DO NOT use the appliance for structural support. The ...
Other models in this manual:Fireplaces - DT-400CEP (973.7 kb)
Fireplaces - DT-400CEN (973.7 kb)
Fireplaces - DT-400CEP (973.7 kb)
Fireplaces - DR-400CEN (973.7 kb)