|
manual abstract
Prior to initial use, this finish should be cured as described below. Because the curing procedure may cause smoke or odor, we suggest it be conducted outdoors and away from flammable materials. • Locate operating instructions on heater cabinet. • Read operating instructions. • Start the heater and adjust the control valve to a low volume. • Gradually open the control valve to full capacity. • After 10 to 15 minutes or when all smoke and odor have disappeared, close LP-gas cylinder valve and allow gas to burn out of system. OPERATING INSTRUCTIONS FOR THE “Hot Box” RED DRAGON CH 220, CH 225 AND CH 250 CONSTRUCTION HEATERS Note: The “HOT BOX” is intended for the temporary heating of buildings under construction, alteration or repair. Use only in a well-ventilated area. Lighting Instructions 1. Remove unit from box. Be sure to remove all packaging. 2. Visually inspect all hose for cuts, nicks or abrasions. 3. Place unit on noncombustible surface and keep the unit away from all combustibles. 4. Connect unit to a 100 lb. LP cylinder (configured for vapor withdrawal). 5. Be sure control valve on unit is closed. 6. Slowly open tank valve. 7. Check all connections for leaks using soapy water. Should a leak be found, correct and retest before proceeding. 8. Depress button on safety valve and slowly open the control valve until a small amount of gas can be heard escaping from the orifice. 9. When a small amount of gas is heard, depress ignitor button several times or until unit is lit. If unit fails to light, close all valves and contact customer service at 800-255-2469. 10. When unit ignites, continue to hold safety valve for 30-60 seconds to warm the thermocouple. 11. After 30-60 seconds, release safety valve button. If unit goes out, repeat steps 1 through 10 holding the safety valve for up to 90 to 120 seconds. 12. With the unit ignited, adjust flame to desired output. Storage • When the heater is to be stored indoors, the connection between the LP-Gas supply cylinder(s) and the heater must be disconnected and the cylinder(s) removed from the heater and stored in accordance with NFPA Pamphlet 58. • The unique design of the “HOT BOX” allows safe stacking of the units to reduce storage space during the off-season. • Before igniting the burner after seasonal storage, check to make sure components are free of dust or other flammable debris which can accumulate during storage. • A plastic cap protects the P.O.L. during shipment and should be placed over the end of the P.O.L. when the unit is detached from the propane cylinder. This will keep contaminants out of the propane supply hose. Heat Pattern Heated Air Deflected Downward Cool Air Drawn In OPERATING INSTRUCTIONS FOR THE “Hot Box” RED DRAGON CH 220, CH 225 AND CH 250 CONSTRUCTION HEATERS Questions? If you have any questions about the operations of the CH 220, CH 225 or CH 250 call your local distributor or Flame Engineering, Inc. at 1-800-255-2469 or fax 785-222-3619. Parts List 1. P-3200 W (CH 220) Ex...
Other models in this manual:Electric Heaters - CH 220 (73.94 kb)
Electric Heaters - CH 225 (73.94 kb)