Login:
Votes - 4, Average rating: 4 ( )

User manual Enerco, model MH175KT

Manafacture: Enerco
File size: 433.11 kb
File name: befc7fb5-1dad-4de6-a7bd-f04ce6bef898.pdf
Language of manual:enfr
Free link for this manual available at the bottom of the page



manual abstract


ASSEMBLY (For 125,000, 175,000 and 210,000 BTU/hr models only) Wheel and handles are found in the shipping carton along with mounting hardware. The wheels, axle and mounting hardware are in a package. Tools required are a 5/16" nutdriver, 3/8" open or adjustable wrench and standard pliers. 1. Assemble the wheels onto the wheel support frame as follows: a. Install one of the cotter pins into the hole on one end of axle. b. Slide the large washer, then wheel onto the axle next to the cotter pin. Operating Instructions and Owner’s Manual 04/05 70276 Rev. A 3 c. c. d. Slide the partially assembled axle through the wheel support frame. e. Slide the small washer, spacer, and small washer onto the axle next to the wheel support. f. Slide the wheel then large washer onto the axle and hold in place with the remaining cotter pin. g. Install the caps over the larger washers to finish the wheel assembly. 2. Position the heater on the wheel support frame assembly with the exit end over the wheels. 3. Use eight screws and nuts to attach the handles to the top of the tank flange. The screws will go through the handles, tank flange and wheel support frame. Install the nuts and finger tight only until all nuts are installed. 4. Tighten all the nuts. 5. Attach cord caddies to handles using No. (14) & No. (5) screws and nuts. Handle assembly for 125KT, 175KT& 210KT only. ITEM PART NO. DESCRIPTION 1 24338 Handle, Front 2 24338 Handle,Rear 3 24339 Wheel Support Frame 4 26977 Machine Screw Blk (long) 5 26037 Kep Nut Blk 6 28746 Axle 7 28752 Wheel (8’’ Dia.) 7 22110 Wheel (13’’ Dia. 210KT only) 8 28751 Cap 9 28748 Spacer 10 28747 Washer, Small 11 28749 Washer, Large 12 28750 Cotter Pin 13 28754 Ext. Cord Caddy 14 27336 Machine Screw Blk (Small) QTY 1 1 1 8 12 1 2 2 2 2 4 2 2 2 4 PREPARING FOR OPERATION 1. Check the heater for possible shipping damage. If any is found, immediately notify the factory. 2. Follow all of the "Precautions". 3. Fill the fuel tank with clean kerosene. In extremely cold weather, condensation may develop in the tank and it is recommended that a tablespoon of de-icer be added for each gallon (4 liters) of fuel in the tank. When filling the heater, use at least 2 gallons (8 liters) of fuel. Be sure heater is level and do not overfill. Use a funnel or can with a long fill spout. IMPORTANT: Before filling fuel tank the first time or after extended storage periods, drain the fuel tank of any moisture or condensation. 4. Locate heater at a safe distance from combustible materials. Models 50K & 75KT is not suitable for use on wood floors or other combustible materials. When used, the heater should rest on suitable insulating material at least 1 inch thick and extending 3 ft. or more beyond the heater in all directions. START 1. 50K: Plug the heater into a grounded 115V, 60 Hz, 1 O outlet. 75KT, 125KT, 175KT & 210KT: Turn thermostat to lowest setting, make sure “On/Off” switch is “Off”. Plug the heater into a grounded 115V, 60 Hz, 1 O outlet. Turn therm...

Other models in this manual:
Gas Heaters - HS125KT (433.11 kb)
Gas Heaters - MH125KT (433.11 kb)
Gas Heaters - MH210KT (433.11 kb)
Gas Heaters - MH50KT (433.11 kb)

Reviews



Your review
Your name:
Please, enter two numbers from picture:
capcha





Category